Just a quick messgae to let you know that i a few minutes we will be flicking the switch and sending traffic to the new Dual Quad Core Xeon. All data has been transferred except for email. This will be done separately by connecting the old HDD directly to the new server and copying over that way as copying mail across a network would take forever. Thenew server also has CF 8, IMAP and all that good stuff. DSNs should be migrated too but they can sometimes be a bit sticky. So I urge everyone to check and make sure everything is working (in about 30-60 minutes) and let us know if anything is wrong and we'll fix right away.
About 15 clients were moved to Graviton and I'll be checking all those accounts to make sure they do resolve to Graviton before I remove them. I'll also move you guys over to the Graviton mail list.
Enjoy the new server, it is a beast!